We want to start tracking some equipment productivity. The monitoring system can generate data showing when an operation was started and when it ended, e.g. start 8:00AM end 10:10AM, time elapsed 2:10. However, when we export the productivity report to Excel, the 2:10 is shown as 2:10AM, not 2 hours 10 minutes, or even 130 minutes. I haven't seen the report, but have been asked if I've got any ideas on how to convert it. I've never had much need to work with time calculations in Excel, so I'm hoping someone here can help. Help!
--
Golf is a relatively simple game, played by reasonably intelligent people, stupidly.
↧